The system can be tested in sections, over a testing schedule, so long as each luminaire is tested each calendar month. It is important to note that the entire system doesn't have to be tested at the same time. The duration of the test should be sufficient to ensure that the luminaire operates correctly, whilst minimising any damage to the system components, e.g. ![]() This is a short functional test in accordance with BS EN 50172:2004 / BS 5266-8:2004. ![]() Monthly Emergency Lighting TestingĪll emergency lighting systems should be tested monthly. No test of the system operation is required. In this case a visual inspection of the indicators on the central power supply to identify that the system is operational. This interval specifically applies to central battery source emergency lighting systems. The following minimum inspection and tests should be carried out at the intervals recommended below.